Our cooling systems are engineered specifically for high-density crypto mining hardware.

2.4MW skid-mounted hydro cooling solution, designed for easy indoor deployment
Our cooling systems are engineered specifically for high-density crypto mining hardware.
Lower temperatures, higher hashrate stability, and reduced energy waste.
From compact units to full containerized data centers, all solutions are modular and ready for expansion.
Technical Data
2400 kW
240 units – WhatsMiner / SealMiner / VolcMiner / Auradine
PLC touchscreen integrated with leak detection, temperature control, system monitoring, alarming, constant pressure control
9800 mm (L) × 2220 mm (W) × 2652 mm (H)
cluster HWCluster-2.4 - 9350 kg.
2.4 MW dry cooler - 6500 kg.

We offer full-cycle engineering and project design services tailored to your mining infrastructure needs.

Systems designed to grow with your mining operation: from single-unit setups to multi-MW data centers.

Advanced cooling systems are designed for high heat recovery efficiency.


A U.S.-based client (under NDA) selected our immersion container solution to ensure stable, efficient ASIC mining performance in demanding climate conditions, with temperatures ranging from - 40°C to +40°C between May and October.
